Week of September 19th, 2011
The following activities are scheduled for the week of Sept. 19th:
- Mainline paving will continue on Friday Sept. 16th
- Work on finishing the A ramp (Northboud off ramp to Main Street) and the D ramp (Southbound on ramp to 151 and Madison)
- Traffic controls are scheduled to remain the same
- Curb and gutter work will also continue on to O'Keeffe Ave.
Truck Traffic Advisory:
· It is currently very difficult for large trucks to make a left turn onto Main Street from the SB 151 ramp. These trucks may want to either 1) turn right and go around the Round-a-bout to go east bound on Main Street, or 2) they could go up to the 151-CTH C - Reiner Rd interchange and turn around to head NB on 151and exit on to Main Street. This right turn is much easier for large trucks.
Traffic control will remain the same for this week. Note that there are no turns onto Main Street from O'Keeffe Ave.
Persons travelling this route are advised that construction is likely to be occurring on Saturdays for the next several weeks. People are also strongly encouraged to continue to slow down and watch for construction workers and equipment at all times in the construction zone.
The next business meeting is scheduled for September 22nd at 9:00 a.m.
Pending Work for Week of Aug. 22nd (NEW)
The following activities are scheduled for the week of August 22nd:
Work performed next week will consist of finishing miscellaneous items on the North side of Main St and the ramps on the North side. Topsoil placement, seed, fertilize and mulching of the terrace and yards on the north side.
Traffic control will be switching on Thursday August 25th, when all traffic will be shifted to the North side of Main Street. Traffic will be traveling on the new concrete pavement. The traffic will remain one lane in both directions. Turning movement restrictions will remain the same. No left turn from O'Keeffe Ave onto Main Street; no left turns out of Hamilton Place apartments; no left turn onto O'Keeffe Ave from WB traffic.
Persons travelling this route are advised that construction is likely to be occurring on Saturdays for the next several weeks. People are also strongly encouraged to continue to slow down and watch for construction workers and equipment at all times in the construction zone.
The next business meeting is scheduled for August 25th at 9:00 a.m.
Pending Work for Week of Aug. 15th (NEW)
The following activities are scheduled for the week of August 15th:
Storm sewer installation and paving under and near the overpass will continue this week, including turn lanes underneath the bridge.
Sidewalk installation also continues, and handicapped ramps should be poured by early next week. The bike path on the north side of Main Street should be open this week.
Landscaping and restoration of areas near completed sections of the project will be ongoing.
Traffic control may shift slightly to accommodate pavement markings and completed pedestrian & bicycle areas. Motorists and pedestrians are advised to watch for changes in the coming weeks as the project shifts.
Persons travelling this route are advised that construction is likely to be occurring on Saturdays for the next several weeks. People are also strongly encouraged to continue to slow down and watch for construction workers and equipment at all times in the construction zone.
The next business meeting is scheduled for August 25th at 9:00 a.m.
SPECIAL NOTE: While Main St. will continue to remain open, Corn Fest traffic on August 18-21st is encouraged to utilize alternative routes to get to Angell Park. Alternatives include:
- 151 Exit to Hwy. C, to O'Keeffe Ave, to Main Street to Downtown
- 151 Exit to STH 19 (Windsor St.) to Bristol St., to Downtown
- 151 Exit to CTH N (Bristol St.) to Downtown
- I-94 Exit to CTH N north
Key Contact Information
City of Sun Prairie Project Office: (608) 215-1167
WisDOT Project Office: (608) 834-1207
Contractor Office (R.G. Huston): (608) 255-9223
Project Office Address: 1632 W. Main St. (Access from Hart Rd.)
E-mail: [email protected]
Subscribing/Unsubscribing to this List
Please forward this e-mail to whomever might be interested in following this project. Recipients can subscribe or unsubscribe by clicking on the appropriate links at the bottom of this e-mail.
Business Promotions for the Week of August 15th
If your business is conducting some sort of special promotion during construction, submit it to [email protected] and we'll let everyone on our project e-mail list know about it here in this section of this weekly update. Affected businesses are encouraged to collaborate on advertising and promotions to help offset any potential impacts during construction.
Contact the Sun Prairie Chamber of Commerce, the Sun Prairie Star, and the City of Sun Prairie Office of Economic Development for additional resources.
Taco Bell (Sunday August 7th to Saturday August 27th) NEW
Sunday kicks off the 99¢ Nachos Supreme event. The event runs for 3 weeks from Sunday, August 7th to Saturday, August 27th.
Anytime Fitness Construction Special (Ongoing)
PAY NO DUES UNTIL THE CONSTRUCTION IS OVER! Anytime Fitness is under construction as well. We are currently remodeling and expanding our current club. Stop by the club, with mention of this ad, and pay no dues until the City of Sun Prairie Construction is finished. Please call Ashley or Kyle at 834.1222 to get set up with a complimentary tour and workout today.
Domino's Pizza Construction Special (Ongoing)
Domino's will have a construction special going on for carryout customers and construction workers.
The special is twofold:
1) get 2 or more large 1 topping Pizzas for $5.99 each ( Carryout Only) internet coupon code 5992
or
2) get a Large 1 topping Pizza for $5.99 when you purchase any side item at menu price ( Carryout Only) internet coupon code 599
Side items include: Breadsticks, Cheesy Bread Sticks, Cinnastix, Chocoalte Lava Crunch Cakes , Chicken wings both boneless and bone-in, oven baked sandwich, breadbowl pasta , or 2 liter bottles of coca cola products.
Domino's is located at 1585 West Main Street just west of Culvers and Super Lube. Call the store at (608) 825 -3200 or order online at www.dominos.com.
Update
Week of August 8, 2011
Pending Work for Week of Aug. 8th (NEW)
The following activities are scheduled for the week of August 8th:
Pedestrian traffic will be moved from the existing sidewalk to the new driving lanes on North side of Main Street.
Grading for the new pedestrian path on north side of Main Street will begin this week.
Pedestrian path on south side of the project to be installed in the next two weeks.
Pedestrian traffic will be moved to new permanent path on North side of Main Street.
Remove temporary pedestrian path and pavement and install storm sewer.
The two closed on ramps (from Main St. to 151 North and the off ramp to from 151 South to Main St.) should be open Monday morning.
Traffic control and vehicular traffic patterns will remain the same with the exception of the opening of the two ramps and pedestrian traffic will be re-routed as described above.
Persons travelling this route are advised that construction is likely to be occurring on Saturdays for the next several weeks.
People are also strongly encouraged to slow down and watch for construction workers and equipment at all times in the construction zone.
The next business meeting is scheduled for August 11th at 9:00 a.m.